2022
DOI: 10.1080/09537287.2022.2026673
|View full text |Cite
|
Sign up to set email alerts
|

Causes of delay in offshore wind turbine construction projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 89 publications
0
6
0
Order By: Relevance
“…They reported how the offshore wind farm infrastructure is assembled in accordance with its technical dependencies, and noted that technical dependencies appear to make the ordering of processes predictable and replicable. This is the case especially for installation processes that require equipment (e.g., cranes, purpose-built vessels, or underwater robotics) (Barlow et al 2018), which might explain why offshore installation in particular has been planned using CPM (Lerche 2020). When a technical dependency is broken, schedule adjustments can be made, e.g., if a foundation is installed but cabling is not complete, the turbine can be installed but not commissioned, and temporary power generators would be required to sustain its product integrity (lifetime expectancy) until the cabling is completed.…”
Section: Processmentioning
confidence: 99%
See 3 more Smart Citations
“…They reported how the offshore wind farm infrastructure is assembled in accordance with its technical dependencies, and noted that technical dependencies appear to make the ordering of processes predictable and replicable. This is the case especially for installation processes that require equipment (e.g., cranes, purpose-built vessels, or underwater robotics) (Barlow et al 2018), which might explain why offshore installation in particular has been planned using CPM (Lerche 2020). When a technical dependency is broken, schedule adjustments can be made, e.g., if a foundation is installed but cabling is not complete, the turbine can be installed but not commissioned, and temporary power generators would be required to sustain its product integrity (lifetime expectancy) until the cabling is completed.…”
Section: Processmentioning
confidence: 99%
“…Installation vessels being the main cost driver, with an average rate of €250,000/day, has made both developers of offshore infrastructure and their supplier pool of manufacturers (cables, transformer stations, foundations, and turbines) conscious of vessel capacities and costs. Consequently, they have shifted their focus to limiting the time spent offshore (Lacal-Arántegui et al 2018;Lerche et al 2020Lerche et al , 2022. Although onshore wind farm infrastructure development and project execution use less expensive equipment, the relative cost of equipment is still considerable.…”
Section: Costmentioning
confidence: 99%
See 2 more Smart Citations
“…Stakeholder judgement is important in selecting the relevant criteria, in identifying their weights, and in scoring the options examined against each objective. While this approach is at the core of MCDA techniques, its subjective nature is often a cause of concern, and even acrimony, amongst the stakeholders, often leading to protracted periods of negotiation 19 , 20 .…”
Section: Introductionmentioning
confidence: 99%