1970
DOI: 10.1016/0375-6505(70)90076-3
|View full text |Cite
|
Sign up to set email alerts
|

Cements and cementation in geothermal well drilling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1979
1979
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…On the other hand, improve zonal isolation in the annulus between the casing and the formation of an oil well, has been and continues to be the main reason to develop new technologies. In the 70's work began to convert water-based drilling fluids using granulated blast furnace slag as addition, from this moment several investigations have been made to optimize this technology [4][5][6]. Numerous studies suggest the use of a universal drilling fluid containing granulated blast furnace slag as addition (between 25 and 35 %); after which it has initiated the use of cement slurries with a variable percentage of granulated slag replacement (between 20 and 40%) [7,8].…”
Section: Introductionmentioning
confidence: 99%
“…On the other hand, improve zonal isolation in the annulus between the casing and the formation of an oil well, has been and continues to be the main reason to develop new technologies. In the 70's work began to convert water-based drilling fluids using granulated blast furnace slag as addition, from this moment several investigations have been made to optimize this technology [4][5][6]. Numerous studies suggest the use of a universal drilling fluid containing granulated blast furnace slag as addition (between 25 and 35 %); after which it has initiated the use of cement slurries with a variable percentage of granulated slag replacement (between 20 and 40%) [7,8].…”
Section: Introductionmentioning
confidence: 99%