1998
DOI: 10.1109/3476.720421
|View full text |Cite
|
Sign up to set email alerts
|

Challenges in determining electronics equipment take-back levels

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

1999
1999
2021
2021

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(5 citation statements)
references
References 4 publications
0
5
0
Order By: Relevance
“…The fraction of salvaged parts that pass the test is given by pass fraction Quality Quality Quality (5) where the interpretation of test effectiveness is the probability of the test or inspection activity successfully identifying a defect in a part. The assembly cost for the primary build is computed using only (1). Equations (1)-(5) are used to compute the cost of a process step that assembles a component to the system during the secondary build.…”
Section: A Formulationmentioning
confidence: 99%
See 1 more Smart Citation
“…The fraction of salvaged parts that pass the test is given by pass fraction Quality Quality Quality (5) where the interpretation of test effectiveness is the probability of the test or inspection activity successfully identifying a defect in a part. The assembly cost for the primary build is computed using only (1). Equations (1)-(5) are used to compute the cost of a process step that assembles a component to the system during the secondary build.…”
Section: A Formulationmentioning
confidence: 99%
“…When the primary life of the product is over, the original equipment manufacturer (OEM) of the product is rarely involved with the product again. With the advent of more stringent product take-back laws in Europe and those on the horizon in the United States [1], OEM's of many products are being forced to contend with a significant percentage of the products being returned to the OEM at the end of the product's primary life. OEM's also contend with the return of products when the product is leased to the customer for a finite period of time.…”
Section: Introductionmentioning
confidence: 99%
“…There are various forecasting method reported in the past (Kelle and Silver, 1989;Marx-Gomez et al, 2000Toktay et al, 2003;Stuart et al, 1998). However, those studies were only based on time series and did not consider the characteristics of the locations.…”
Section: Introductionmentioning
confidence: 99%
“…An effective collection strategy can be designed if the information on the rate of returned products for a period of time in a certain location is available. There are various forecasting method reported in the past (Kelle and Silver, 1989;Marx-Gomez et al, 2000Toktay et al, 2003;Stuart et al, 1998). However, those studies were only based on time series and did not consider the characteristics of the locations.…”
Section: Introductionmentioning
confidence: 99%
“…Toktay et al modeled predicting return flows for instant cameras (Toktay et al, 2000). Stuart et al developed a new mathematical framework to estimate produt takeback levels by defining various levels of product life and by incorporating those terms into a life estimation framework (Stuart et al, 1998).…”
Section: Reverse Logisticsmentioning
confidence: 99%