2002
DOI: 10.1061/(asce)0733-9364(2002)128:6(545)
|View full text |Cite
|
Sign up to set email alerts
|

Challenges in Line-of-Balance Scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
86
0
13

Year Published

2010
2010
2023
2023

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 119 publications
(99 citation statements)
references
References 9 publications
0
86
0
13
Order By: Relevance
“…As discussed in linear scheduling methods, the location and time buffers (time floats) were defined and used in indicating how close activities can become while being conducted [13,21]. The rate float, representing the amount that the production rate of a non-controlling linear activity can be lowered before the activity will become a controlling segment, is used to evaluate the impact of a delay on the project completion [22].…”
Section: Floats In Linear Schedulingmentioning
confidence: 99%
“…As discussed in linear scheduling methods, the location and time buffers (time floats) were defined and used in indicating how close activities can become while being conducted [13,21]. The rate float, representing the amount that the production rate of a non-controlling linear activity can be lowered before the activity will become a controlling segment, is used to evaluate the impact of a delay on the project completion [22].…”
Section: Floats In Linear Schedulingmentioning
confidence: 99%
“…Together these two lines "describe the outer limits in time of our unit network which is repeating itself opposite each increment of the Line-of-Balance Quantity scale" (Lumsden, 1968, p. 15). Researchers thus implicitly used AOA when creating their networks for LOB quantity charts (Arditi et al, 2002;Hegazy, 2001). Figures 1c and 2c show how changing the crew rate in the example from two crews to one crew results in modified progress slopes and a different pattern, which does not overlap anymore, but inserts interruptions into the progress.…”
Section: Activity Representationmentioning
confidence: 99%
“…Clearly each of the acceleration strategies stated above comes with associated costs. Examples of these associated costs are increased direct costs as in labor wages and equipment running costs, and indirect costs in the form of increased supervision and loss of productivity due to congestion in case of increased crews size 1 . On the other hand, as projects' total duration decreases, indirect costs also decrease.…”
Section: Accelerating Strategiesmentioning
confidence: 99%