1998
DOI: 10.2118/37066-pa
|View full text |Cite
|
Sign up to set email alerts
|

Challenges With Jointed-Pipe Underbalanced Operations

Abstract: Successful underbalanced operations demand a systematic approach with integration of engineering, operations, production, reservoir, and geology. There are significant advantages to underbalanced drilling (UD). Formation damage can be minimized if proper circulating fluids and operating parameters are chosen; there is an opportunity for reservoir evaluation and characterization while drilling; lost circulation and differential sticking can be avoided, combined with improvements in drilling rate of penetration … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
12
0

Year Published

2005
2005
2015
2015

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 25 publications
(12 citation statements)
references
References 2 publications
0
12
0
Order By: Relevance
“…And alternatif one only gives a limit of underbalance diferential from pore pressure @ 5 years for around 30-50 psi. This is not an ideal condition since a bottom hole pressure fluctuation on drilling connections (Saponja, 1998) needs a minimum safety factor for connection condition for about 350 psi. If this alternatif is applied then when pipe connection, it will absolutely become overbalance.…”
Section: Bottom Hole Pressure Window Determinationmentioning
confidence: 99%
See 1 more Smart Citation
“…And alternatif one only gives a limit of underbalance diferential from pore pressure @ 5 years for around 30-50 psi. This is not an ideal condition since a bottom hole pressure fluctuation on drilling connections (Saponja, 1998) needs a minimum safety factor for connection condition for about 350 psi. If this alternatif is applied then when pipe connection, it will absolutely become overbalance.…”
Section: Bottom Hole Pressure Window Determinationmentioning
confidence: 99%
“…Considering the bottom hole pressure fluctuation on drilling connections (Saponja, 1998) addtional factor, then a range of Qliquid at 0.10ft 3 /s and a range of Qgas around 2.90 ft 3 /s -3.20 ft 3 /s should be implemented.…”
Section: Bottom Hole Pressure Window Determinationmentioning
confidence: 99%
“…However, in an underbalanced operation, it is difficult to guarantee that the drilling fluid pressure is always in underbalanced condition 11 . An overbalanced pressure can still be applied on the formation during certain period for various operational reasons like bit trips or well intervention and it can cause a severe formation damage due to the absence of filter cake protection and huge filtrate invasion.…”
Section: Description Of the Problemmentioning
confidence: 99%
“…To better evaluate formation damage due to drilling fluid, significant efforts have been made in order to develop laboratory techniques [1][2][3][4][5][6][7][8][9][10][11][12] . Formation damage tests allow to evaluate return permeability after a core sample has been subjected to the tangential flow of a drilling fluid.…”
Section: Description Of the Problemmentioning
confidence: 99%
See 1 more Smart Citation