Abstract:The paper outlines operational challenges during the well securement of a Power Water Injector (PWI) completed in the reservoir oil-water contact (transition zone). Surface integrity issue arose in Well-A necessitating the installation of adequate downhole barriers to carry-out surface remedial repairs safely. Well isolation shut-offs were not successful in eliminating surface pressure to meet the minimum stipulated operational requirements for this field. Well operator's barrier philosophy mandates the presen… Show more
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.