2014
DOI: 10.2749/222137814814068571
|View full text |Cite
|
Sign up to set email alerts
|

Challenging Design Aspects of a 3-Tower Cable-Stayed Bridge

Abstract: <p>KYTC's project requirements and the design/build team's drive to reduce cost and shorten construction schedule led to the development of a three-tower cable-stayed bridge with a flexible foundation system in the longitudinal direction. Working through the site specific challenges and external constraints the design team was able to deliver an affordable solution that could be built in a short period of time.</p> <p>The key measures taken by the design build team to address these unique cha… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles