2009
DOI: 10.1016/s0376-7361(08)00211-2
|View full text |Cite
|
Sign up to set email alerts
|

Chapter 11 Installing the Completion

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…Completion system is an important component after the well is drilled. Its purpose is to connect the reservoir to the surface or prepare the well for production (Bellarby, 2009). The basis considerations in designing well completion system are the lithology, fluid properties, and fluid characteristics.…”
Section: Basic Theorymentioning
confidence: 99%
“…Completion system is an important component after the well is drilled. Its purpose is to connect the reservoir to the surface or prepare the well for production (Bellarby, 2009). The basis considerations in designing well completion system are the lithology, fluid properties, and fluid characteristics.…”
Section: Basic Theorymentioning
confidence: 99%