2012
DOI: 10.2172/1086422
|View full text |Cite
|
Sign up to set email alerts
|

Characteristics of STP Pre-2004 Archived KE Basin Sludge Samples Before and After Re-Jarring in the RPL - April 2012

Abstract: SummaryThe Sludge Treatment Project (STP), managed for the U.S. Department of Energy (DOE) by CH2M Hill Plateau Remediation Company (CHRPC), is responsible for operating the K West (KW) Basin fuel storage pool and managing the sludge (and other materials) that it contains. The STP mission includes characterization, containment, safe removal, treatment, and transportation of all sludge (treated or untreated) from the KW Basin. Since the 1990s, samples of K Basin sludge have been collected during several samplin… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 11 publications
(5 reference statements)
0
4
0
Order By: Relevance
“…The other 29 tracked samples are from pre-2004 sludge collection activities from the K East and West Basins (22 samples stored wet and seven samples stored dry). These samples were placed into new containers around April 2012 as described by Sinkov et al (2012) and incorporated into the K Basin PNNL project 52578 monthly monitoring program in November 2012 (see Appendix C). The only change to this current inventory is KENLOP #2, which was split into two jars per TI 52578-TI052.…”
Section: Sample Summarymentioning
confidence: 99%
See 3 more Smart Citations
“…The other 29 tracked samples are from pre-2004 sludge collection activities from the K East and West Basins (22 samples stored wet and seven samples stored dry). These samples were placed into new containers around April 2012 as described by Sinkov et al (2012) and incorporated into the K Basin PNNL project 52578 monthly monitoring program in November 2012 (see Appendix C). The only change to this current inventory is KENLOP #2, which was split into two jars per TI 52578-TI052.…”
Section: Sample Summarymentioning
confidence: 99%
“…(c) The sludge sample contained a large monolithic structure in addition to settled sludge that confounded calculations of settled sludge volume and mass. Therefore, sludge volume and mass were copied from original data collection, Sinkov et al (2012), to provide a sense of the sludge mass and volume these samples represent. (d) The volume and mass were small and were copied from data reported by Sinkov et al (2012).…”
Section: Sample Summarymentioning
confidence: 99%
See 2 more Smart Citations