2019
DOI: 10.1016/j.autcon.2018.10.025
|View full text |Cite
|
Sign up to set email alerts
|

Characterizing interactions with BIM tools and artifacts in building design coordination meetings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
26
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 52 publications
(79 citation statements)
references
References 42 publications
0
26
0
1
Order By: Relevance
“…Third, the dimensions and indicators help enhance the understanding of human-BIM interactions in construction projects. The difficulty that participants access BIM determines the interaction frequency with BIM (Mehrbod et al, 2019). In this study, the difficulty is reduced by increasing multiple channels to connect with BIM.…”
Section: Theoretical Implicationmentioning
confidence: 92%
“…Third, the dimensions and indicators help enhance the understanding of human-BIM interactions in construction projects. The difficulty that participants access BIM determines the interaction frequency with BIM (Mehrbod et al, 2019). In this study, the difficulty is reduced by increasing multiple channels to connect with BIM.…”
Section: Theoretical Implicationmentioning
confidence: 92%
“…Por exemplo, o processo BIM ajudou os profissionais a identificar mais de três milhões e resolver mais de 2,4 milhões de conflitos antes da construção de um grande projeto hospitalar [11]. Embora os benefícios do BIM estejam bem estabelecidos, os participantes do projeto ainda enfrentam desafios significativos que interrompem e dificultam o processo de coordenação, mesmo quando as ferramentas do BIM estão prontamente disponíveis [12]. Por esse motivo, a decisão de implementa-lo em uma organização é desafiadora, visto que essa necessita avaliar os benefícios, custos e desafios.…”
Section: Building Information Modelling (Bim)unclassified
“…In literature, numerous research activities are dealing with BIM [21]- [23]. These research activities consider the entire lifecycle of a building from design [24], [25] over construction [26], [27] up to operation [28], [29] in a very comprehensive way. In addition to this holistic perspective of an entire lifecycle, a major part of studies analyses and describes the content of the individual lifecycle phases in more detail.…”
Section: Originalitymentioning
confidence: 99%