2018 IEEE Real-Time and Embedded Technology and Applications Symposium (RTAS) 2018
DOI: 10.1109/rtas.2018.00040
|View full text |Cite
|
Sign up to set email alerts
|

Closing the Gap Between Stability and Schedulability: A New Task Model for Cyber-Physical Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 18 publications
(10 citation statements)
references
References 32 publications
0
10
0
Order By: Relevance
“…The upward arrows indicate when the measurements are received at the processor and tasks are invoked. the impact on system performance have been proposed in the prior literature (e.g., [9,10,11,12,13]), this paper addresses the impact of limited computing capacity on the ability to satisfy physical constraints (i.e., constraints on input and/or state variables) with the Command Governor scheme; this problem is different and has not been addressed in the prior literature.…”
Section: Prior Work On Real-time Schedulingmentioning
confidence: 99%
See 3 more Smart Citations
“…The upward arrows indicate when the measurements are received at the processor and tasks are invoked. the impact on system performance have been proposed in the prior literature (e.g., [9,10,11,12,13]), this paper addresses the impact of limited computing capacity on the ability to satisfy physical constraints (i.e., constraints on input and/or state variables) with the Command Governor scheme; this problem is different and has not been addressed in the prior literature.…”
Section: Prior Work On Real-time Schedulingmentioning
confidence: 99%
“…Thus, in the presence of early termination, to ensure constraint satisfaction one could resort to keeping the command signal unchanged (note that v * (k) is feasible at sampling instant k + 1; see Remark 2), but this could degrade system performance. Another approach to solve (12) is to use the primal barrier interior-point methods. The main weakness of these methods is that they require a high number of Newton steps when high accuracy is required [54, pp.…”
Section: Proposed Solution: Rotecmentioning
confidence: 99%
See 2 more Smart Citations
“…Chwa et al [48] propose a co-design and scheduling method to maximize QoC for control applications. The authors assign a sampling period, and a maximum number of consecutive deadline misses as parameters for each task concerning system stability.…”
Section: Related Workmentioning
confidence: 99%