2021
DOI: 10.1061/(asce)co.1943-7862.0002016
|View full text |Cite
|
Sign up to set email alerts
|

Cloud Contractor Selection Model for Design-Build Open Tender

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 100 publications
0
6
0
Order By: Relevance
“…Such uncertainty, fuzziness, or vagueness results from the absence of distinctness (Ocampo et al 2018). In the way humans perceive the world, vagueness, the opposite of exactness, cannot be avoided (Martin and Ramjarrie 2021). When making real-world decisions, it is preferable to use fuzzy numbers because linguistic preferences reflect perceptions (Bui et al 2020).…”
Section: Designmentioning
confidence: 99%
See 1 more Smart Citation
“…Such uncertainty, fuzziness, or vagueness results from the absence of distinctness (Ocampo et al 2018). In the way humans perceive the world, vagueness, the opposite of exactness, cannot be avoided (Martin and Ramjarrie 2021). When making real-world decisions, it is preferable to use fuzzy numbers because linguistic preferences reflect perceptions (Bui et al 2020).…”
Section: Designmentioning
confidence: 99%
“…Comparatively, descriptive specifications or performance specifications state the code or standard by which the designer should abide. The degree of elucidation defines the various DB categories forming a contract (Martin and Ramjarrie 2021). Because design-build projects can still be in the design stage when construction occurs, and the programming of materials becomes more complicated because the quantity and quality are not defined by the client before a contractor is engaged.…”
Section: Introductionmentioning
confidence: 99%
“…It reduces the risk of failure in selecting a contractor for design and construction in open tenders, providing the lowest bidder [31].…”
Section: Risks In the Choice Of Construction Personnelmentioning
confidence: 99%
“…Increasingly used in construction management research, the Delphi method is a structured communication technique originally developed as a systematic, interactive forecasting method that relies on a panel of experts answering questionnaires in consecutive Rounds until convergence, with the facilitator providing a summary of their judgments to the group in the form of the mean or median response in each Round: as uncertainties arise from the judgments of decision makers, this method accounts for interpersonal uncertainty and variability in one's opinion (Martin & Ramjarrie, 2021). Of particular relevance here is the increasing use of the Delphi method in such construction management research as graduate education (Pathuri et al, 2020), company performance (Mansour et al, 2020) and contract administration (Gunduz & Elsherbeny, 2020), as well as contractor selection (Mahdi et al, 2002), in terms of performance criteria (Gunasekara et al, 2021), safety criteria (Gharedaghi & Omidvari, 2019), public contract criteria (Hajek et al, 2017), effectiveness factors (criteria) (Lajimi et al, 2018), construction supply chain pre-qualification and selection criteria (Mahamadu et al, 2017), and project source criteria (Faraji et al, 2020).…”
Section: Literature Reviewmentioning
confidence: 99%