SPE/IATMI Asia Pacific Oil &Amp; Gas Conference and Exhibition 2015
DOI: 10.2118/176195-ms
|View full text |Cite
|
Sign up to set email alerts
|

Coiled Tubing Gas Lift Design and Troubleshooting - Case History

Abstract: VICO Indonesia is an Oil and Gas company which has operated mature fields located in the onshore part of East Kalimantan which has been on production for over 30 years. The fields are dominated by gas reservoirs with a much lower presence of oil reservoirs. Production mechanisms cover from natural depletion to weak and strong water drive, particularly in some of the shallow areas. Recent well completions include single and dual slimhole monobore.The field is a perfect combination of stratigraphic and structura… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…The process of coiled tubing gas lift is to inject compressed gas from the coiled tubing after the well is lowered into the coiled tubing and then discharged through the bottom of the coiled tubing, and the oil production fluid along with the gas flows from the annulus between the tubing and the coiled tubing from the bottom to the wellhead [17]. In this study, according to the process characteristics of coiled oil pipe gas lift, a temperature calculation model with pure gas phase inside the coiled oil pipe and gasliquid phase outside the coiled oil pipe is established.…”
Section: Introductionmentioning
confidence: 99%
“…The process of coiled tubing gas lift is to inject compressed gas from the coiled tubing after the well is lowered into the coiled tubing and then discharged through the bottom of the coiled tubing, and the oil production fluid along with the gas flows from the annulus between the tubing and the coiled tubing from the bottom to the wellhead [17]. In this study, according to the process characteristics of coiled oil pipe gas lift, a temperature calculation model with pure gas phase inside the coiled oil pipe and gasliquid phase outside the coiled oil pipe is established.…”
Section: Introductionmentioning
confidence: 99%