2022
DOI: 10.22266/ijies2022.0228.48
|View full text |Cite
|
Sign up to set email alerts
|

Collaborative Flow-shop Scheduling Using Simulated Annealing and First Price Sealed Bid Auction to Minimize Total Cost and Make-span

Abstract: This work proposes a new flow-shop scheduling model that consists of several flow-shops. Every flowshop acts as an independent entity, but there is a collaboration among them. Although the relation between flow-shops and their customers is exclusive, collaboration through production sharing is possible. This circumstance is different from most studies in flow-shop scheduling problems (FSP), for example, parallel or distributed, where all jobs come from a single point and are then distributed to the production … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 21 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?