2013
DOI: 10.1016/j.enpol.2012.10.041
|View full text |Cite
|
Sign up to set email alerts
|

Colombian ancillary services and international connections: Current weaknesses and policy challenges

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2017
2017
2025
2025

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 14 publications
(8 citation statements)
references
References 11 publications
0
8
0
Order By: Relevance
“…Colombian system operator has developed considerable capabilities to quickly restore transmission capacity after violent disruptions (Carvajal et al, 2013). Finally, in the lower left quadrant we find dimensions that have few connections to the other dimensions in the electricity system.…”
Section: Socio-cultural Factors (Driver)mentioning
confidence: 87%
“…Colombian system operator has developed considerable capabilities to quickly restore transmission capacity after violent disruptions (Carvajal et al, 2013). Finally, in the lower left quadrant we find dimensions that have few connections to the other dimensions in the electricity system.…”
Section: Socio-cultural Factors (Driver)mentioning
confidence: 87%
“…National power transmission systems generally have high reliability and many have some level of design redundancy. Nevertheless, the generation and distribution of electric power incurs significant individual and population exposure: Large power stations are bespoke designs as are large transformers (Sobczak & Behr, 2015), and transmission networks may face significant "resilience" issues (Carvajal, Serrano, & Arango, 2013;Sidhu, 2010). Liquid fuels can be stockpiled at national level, and to a lesser extent locally, however the level of stockpiling is limited -and even the higher levels of stockpiling are likely to be small compared to the time to rebuild a major production plant (terminal, or refinery).…”
Section: High-exposure Technology Fieldsmentioning
confidence: 99%
“…Considering the market environment under which this ancillary services can be managed, a summary has been made in the table 4 considering the experiences of other countries (Carvajal, Serrano, & Arango, 2013), (Rebours, Kirschen, Trotignon, & Rossignol, 2007), (Andrianesis, Biskas, & Liberopoulos, 2011), (Østergaard, 2006), (Miguélez, Cortés, Rodríguez, & Camino, 2008) and the different market schemes defined in (CREE, 2015c) Table 4: Remuneration proposal for the ancillary services in the system.…”
Section: Mandatory Without Additional Paymentmentioning
confidence: 99%