2013
DOI: 10.2172/1086904
|View full text |Cite
|
Sign up to set email alerts
|

Commissioning of the Fresno, California, Retrofit Unoccupied Test House

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
6
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(6 citation statements)
references
References 6 publications
0
6
0
Order By: Relevance
“…Building Energy Optimization (BEopt) modeling shows energy savings of 50.1%. Full specifications for this house are documented by Stecher and Imm (2013).…”
Section: Introductionmentioning
confidence: 99%
See 4 more Smart Citations
“…Building Energy Optimization (BEopt) modeling shows energy savings of 50.1%. Full specifications for this house are documented by Stecher and Imm (2013).…”
Section: Introductionmentioning
confidence: 99%
“…The zone damper numbers in Table 1 correspond with the labels shown in Figure 2 and Figure 3. The detailed house and system design and commissioning were documented by Stecher and Imm (2013). (Rutkowski 2009) to provide airflows to meet ACCA Manual J loads (Rutkowski 2006, Stecher andImm 2013).…”
Section: Introductionmentioning
confidence: 99%
See 3 more Smart Citations