2015
DOI: 10.1016/j.cie.2015.02.021
|View full text |Cite
|
Sign up to set email alerts
|

Comparison of layered cellular manufacturing system design approaches

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0
2

Year Published

2015
2015
2020
2020

Publication Types

Select...
7
3

Relationship

1
9

Authors

Journals

citations
Cited by 25 publications
(10 citation statements)
references
References 27 publications
0
8
0
2
Order By: Relevance
“…They compared these risk levels using average flow time, total waiting time, work-in-process inventory and cell utilisation which are obtained from simulation results. In another recent work, Erenay et al (2015) investigated alternative layered CMSs' performances with simulation models considering average flow time and WIP. Stochastic GA models were also used for larger problem sizes for stochastic cell formation problems in Egilmez et al (2011Egilmez et al ( , 2012aEgilmez et al ( , 2012b and Egilmez (2012).…”
Section: Cell Formation and Simulationmentioning
confidence: 99%
“…They compared these risk levels using average flow time, total waiting time, work-in-process inventory and cell utilisation which are obtained from simulation results. In another recent work, Erenay et al (2015) investigated alternative layered CMSs' performances with simulation models considering average flow time and WIP. Stochastic GA models were also used for larger problem sizes for stochastic cell formation problems in Egilmez et al (2011Egilmez et al ( , 2012aEgilmez et al ( , 2012b and Egilmez (2012).…”
Section: Cell Formation and Simulationmentioning
confidence: 99%
“…O quadro 7 apresenta a lista completa de referências que abordam os parâmetros citados. Os tempos padrões definidos a priori são observados na prática nos processos que constituem a célula (PEINADO;GRAEML, 2007) O layout projetado para a célula demonstrase adequado para diferentes ciclos produtivos desenvolvidos pelos colaboradores (AALAEI;DAVOUDPOUR, 2016;ARORA;HALEEM;SINGH, 2013;CHANG;WU;WU, 2013;DEEP;SINGH, 2015;BLACK, 2007;METTERNICH;BECHTLOFF;SEIFERMANN, 2013;MOYANO-FUENTES;SACRISTÁN-DÍAZ, 2012;PAPAIOANNOU;WILSON, 2010;RAFIEE et al, 2011;RAMINFAR et al, 2013;RIBEIRO, 2011;TANIMIZU;ISHII;YOKOTANI, 2014) Os processos mais críticos da célula (operações restritivas) são conhecidos e constantemente gerenciados (BROWN, 2015;ERENAY et al, 2015;PEINADO;GRAEML, 2007) Quadro 7 -Parâmetros para o grupo "Configuração da célula" (conclusão)…”
Section: Parâmetros Referênciasunclassified
“…Erenay vd. [17] çalışmalarında, katmanlı bir hücresel sistemi dikkate alarak stokastik bir hücresel tasarım konusuna yönelmişlerdir. Paydar ve Saidi-Mehrabad [18] çalışmalarında, sanal üretim hücrelerinin tasarımında müşteri talepleri ve makine kapasiteleri gibi kritik parametreleri göz önünde bulundurarak tedarik, üretim ve dağıtım planlamasının entegrasyonu için iki amaçlı olasılıksal optimizasyon matematik programlama modeli geliştirmişlerdir.…”
Section: Introductionunclassified