2017
DOI: 10.5572/kosae.2017.33.4.342
|View full text |Cite
|
Sign up to set email alerts
|

Comparison of Measurement Methods and Size Fraction of Fine Particles (PM10, PM2.5) from Stationary Emission Source Using Korean Standard and ISO: Coal Power Plant and Refinery

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 10 publications
0
2
0
Order By: Relevance
“…In September 2016, Gyeonggi Province announced the “Alps Project” as a countermeasure against fine dust centered on the management of the workplace and the spread of an eco-friendly traffic system. 32 They set up a plan to reduce the amounts of fine dust emissions from 4400 tons in 2015 to 1500 tons in 2020. The detailed contents are as follows: (1) complete replacement of old pollution prevention facilities (800 units); (2) expanded installation for electric vehicle rapid charging stations, from 56 to 560 ea; (3) installation of a clean bus stop (200 ea) and designation of an eco-road (6 ea); (4) expanded installation of fine-dust measurement equipment (54 ea) and monitoring environmental pollution using drones; and (5) Buying dust removal vehicles, such as high-pressure water sprayers (100 ea), and their intensive use in spring.…”
Section: Resultsmentioning
confidence: 99%
“…In September 2016, Gyeonggi Province announced the “Alps Project” as a countermeasure against fine dust centered on the management of the workplace and the spread of an eco-friendly traffic system. 32 They set up a plan to reduce the amounts of fine dust emissions from 4400 tons in 2015 to 1500 tons in 2020. The detailed contents are as follows: (1) complete replacement of old pollution prevention facilities (800 units); (2) expanded installation for electric vehicle rapid charging stations, from 56 to 560 ea; (3) installation of a clean bus stop (200 ea) and designation of an eco-road (6 ea); (4) expanded installation of fine-dust measurement equipment (54 ea) and monitoring environmental pollution using drones; and (5) Buying dust removal vehicles, such as high-pressure water sprayers (100 ea), and their intensive use in spring.…”
Section: Resultsmentioning
confidence: 99%
“…It is a representative simultaneous measurement method. However, although the mass concentration of total particulate matter (TPM) measured in the general atmosphere using a cascade impactor can be used as the absolute concentration, it has been stated that the TPM mass concentration measured by the ISO 23210 method for stack measurement cannot be used [6,13].…”
Section: Sourcementioning
confidence: 99%