All 19 ITER toroidal field coil structures (TFCSs) were successfully fabricated by the Japan Domestic Agency (JADA) via solving technical challenges, and a series production was completed. This study presents the results of the welding-deformation control process, which is a remarkable challenge in an efficient fabrication of the TFCSs.