Composite Pavement Systems, Volume 2: PCC/PCC Composite Pavements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2016
2016
2019
2019

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…The design and construction requirements of two-lift pavement are the same as conventional concrete pavement with respect to preparing the subgrade, base, and subbase, as well as ensuring adequate mechanical properties and reinforcement percentages. The SHRP2 carried out a detailed cost analysis for the U.S. Highway 14 project, which was 31.4 km long and 8.3 m wide, with a thickness of 230 mm and was constructed near Waseca, Minnesota, where good quality aggregates were not available (Rao et al, 2013). The conventional single-lift concrete pavement bid was compared with the expected costs if the project were to be constructed with two-lift concrete pavement.…”
Section: Cost Analysis Of Two-lift Concrete Pavementmentioning
confidence: 99%
“…The design and construction requirements of two-lift pavement are the same as conventional concrete pavement with respect to preparing the subgrade, base, and subbase, as well as ensuring adequate mechanical properties and reinforcement percentages. The SHRP2 carried out a detailed cost analysis for the U.S. Highway 14 project, which was 31.4 km long and 8.3 m wide, with a thickness of 230 mm and was constructed near Waseca, Minnesota, where good quality aggregates were not available (Rao et al, 2013). The conventional single-lift concrete pavement bid was compared with the expected costs if the project were to be constructed with two-lift concrete pavement.…”
Section: Cost Analysis Of Two-lift Concrete Pavementmentioning
confidence: 99%
“…The stiffness of the concrete layer was determined by using the modulus of rupture and the compressive strength test results ( 16 ). Compressive strength (28-day) and modulus of rupture were measured to be 36.6 MPa (5,308 psi) and 4.52 MPa (656 psi), respectively.…”
Section: Accelerated Pavement Testingmentioning
confidence: 99%
“…To achieve this, specifications recommend that the placement of the layers should generally be done within a time limit of 1 hour of each other in order to ensure good bond between layers [6]. The bottom layer serves as the main bending-resistant component of the composite slab, while the top lift is generally constructed with higher-quality constituent materials for improved surface characteristics such as noise and skid resistance [7].…”
Section: Introductionmentioning