Aiming at the problems of serious heterogeneity of reservoirs in Wang 36 well area of Wangjiawan Oilfield, raPId rise of water cut in the oilfield, poor waterflooding development effect and unsatisfactory effects of conventional single profile control measures. Based on PI decision-making, a comprehensive profile-adjustment decision-making technique based on factors such as heterogeneity of water absorption profile and rising rate of water cut is developed. Field application shows that the overall profile adjustment of the block effectively improves the water flooding effect of Wang 36 block. This method has the characteristics of fastness, practicality and strong operability, and has important guiding significance for comprehensive treatment of similar oilfields.