Comprehensive review of delays in power transmission projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
24
0
1

Year Published

2018
2018
2023
2023

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 22 publications
(25 citation statements)
references
References 68 publications
0
24
0
1
Order By: Relevance
“…The literature was reviewed using the broad set of search Since a significant time is spent during the construction phase of a PT project, it is realistic to expect that most delays occur in this stage. It is logical, therefore, to study the causes of delays in construction projects, and most specifically non-power linear projects, as foundational in finding causes of PT project delays [5]. The applicability of the factors causes delays in power generation vis-à-vis PT projects increases further than linear construction projects, as these projects consist of the construction of stations and substations that also exist in PT projects [5].…”
Section: Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…The literature was reviewed using the broad set of search Since a significant time is spent during the construction phase of a PT project, it is realistic to expect that most delays occur in this stage. It is logical, therefore, to study the causes of delays in construction projects, and most specifically non-power linear projects, as foundational in finding causes of PT project delays [5]. The applicability of the factors causes delays in power generation vis-à-vis PT projects increases further than linear construction projects, as these projects consist of the construction of stations and substations that also exist in PT projects [5].…”
Section: Literature Reviewmentioning
confidence: 99%
“…PT is at the heart of the power sector, and project management in the PT sector is challenging because of the presence of high-voltage PT lines and right of way (RoW) issues, which makes PT projects significantly different in scope from other linear power and non-power projects [5,6]. Also, PT project management is thought-provoking because they are usually sited in remote areas, away from existing establishments such as electricity and water supplies, and thus entails careful planning [7].…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…The bridge project was suffered from two years delays time and the cost had increased about RM1.5 million because of location issues, increasing of material cost and other unexpected events [8] [9]. Schedule control is the main key to a successful project [10]. Time overruns give negative impacts on the project and all the involved construction parties.…”
Section: Introductionmentioning
confidence: 99%