2016
DOI: 10.1051/matecconf/20168605015
|View full text |Cite
|
Sign up to set email alerts
|

Computer module for scheduling of transportation of composite beam bridge structures

Abstract: Abstract. The paper presents the theoretical basis, an algorithm and a computer module system supporting scheduling of transportation and assembly of structures of the composite beam bridge implemented in a Just In Time system (JIT). Tabu search method has been used in the optimization procedure.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…The second type of calculation method uses the base frequency of the bridge to calculate the impact coefficient of the bridge. Countries that use this type of calculation method include China and Switzerland; the corresponding formula is shown in Equation (7), where the deck, the lower the connection stiffness of the combined girder, and the higher the impact coefficient of the combined girder, ranging from 1.0 to 2.2.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…The second type of calculation method uses the base frequency of the bridge to calculate the impact coefficient of the bridge. Countries that use this type of calculation method include China and Switzerland; the corresponding formula is shown in Equation (7), where the deck, the lower the connection stiffness of the combined girder, and the higher the impact coefficient of the combined girder, ranging from 1.0 to 2.2.…”
Section: Discussionmentioning
confidence: 99%
“…Conventionally assembled steel-concrete composite continuous rigid [7] beams usually consist of independently fabricated steel main girders with concrete deck slabs. Generally, a steel-concrete composite continuous rigid beam is installed first, forming a continuous steel girder before installing the precast concrete deck slab.…”
Section: Introductionmentioning
confidence: 99%