A comparison is made among power transmission systems required to serve a single set of load center demands from four modes of siting the generating facilities: a single generation site with an ultimate generation capacity of 48,000 MW; four generation sites each with a generation capacity of 12,000 MW; 10 generation sites each with a generation capacity of 4,800 MW; and a system that resulted when the existing utility plan for future generation was logically expanded. The time period for the study is from the year 1985 to the year 2020, when the full 48,000 MW of new capacity from the single large nuclear energy center is on-line, The load centers served are Huntsville,