Configuration Analysis of Integrated Project Delivery Principles’ Obstacle to Construction Project Level of Collaboration

Abstract: Integrated Project Delivery (IPD) with collaborative work as its core is supported by increasing numbers of scholars and practitioners, due to the performance improvement of project construction and projects’ success promotion. However, some factors such as the contract, the technology, and the personnel behaviors hinder the application of IPD, which has negative impacts on the collaboration level of construction projects. On the basis of the configuration analysis, the purpose of this paper is to increase the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 31 publications
0
2
0
Order By: Relevance
“…VOSviewer software (version 1.6.17) was used to construct and visualise the bibliometric networks, where the distance between two nodes approximately indicates the relatedness of the nodes (i.e., strongly related nodes are located close and vice-versa). Nodes are positioned in a two-dimensional space within a network of clusters, with colours used to indicate the cluster to which a node has been assigned and font size to indicate the strength of the recurrence [32,33]. As VOSviewer traditionally utilises a single database and automatic processes, and due to the topic of this study returning a narrow amount of results using a single database, the records were inputted manually to allow for specific results in relation to the papers included within this study (from Web of Science and Scopus).…”
Section: Methodsmentioning
confidence: 99%
“…VOSviewer software (version 1.6.17) was used to construct and visualise the bibliometric networks, where the distance between two nodes approximately indicates the relatedness of the nodes (i.e., strongly related nodes are located close and vice-versa). Nodes are positioned in a two-dimensional space within a network of clusters, with colours used to indicate the cluster to which a node has been assigned and font size to indicate the strength of the recurrence [32,33]. As VOSviewer traditionally utilises a single database and automatic processes, and due to the topic of this study returning a narrow amount of results using a single database, the records were inputted manually to allow for specific results in relation to the papers included within this study (from Web of Science and Scopus).…”
Section: Methodsmentioning
confidence: 99%
“…Delivery of an integrated project is based on collaboration, comprising of integrating the faculty, the system, the business structure and the practice in entire process. In this process, all members will tackle adequately their abilities and experiences to optimize project performance, increase value to the owner, reduce waste and maximize effectiveness through all the project phases of design, manufacturing and construction (Mei et al , 2023). Early contributions, concentrating on quality, free flow of information and sharing thoughts, are the fundamental variables that add value to the IPD more than any other delivery procedure (Marco et al , 2018).…”
Section: Literature Reviewmentioning
confidence: 99%