Congestion Management Considering Wind Energy Sources Using Evolutionary Algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
13
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 30 publications
(13 citation statements)
references
References 17 publications
0
13
0
Order By: Relevance
“…The proposed CSA is adopted to minify the congestion cost and release the over burden of the transmission line with the introduction of the wind farm. The congestion cost achieved with the CSA is 5998.3 $/day and is minimum when compared to the other cost obtained with RED, PSO and ABC optimization methodologies referred in [15]- [17] respectively. The losses are also reduced to 58.63 MW from 59.39 MW after the application of proposed CSA for the CM approach adopted with wind farm.…”
Section: Resultsmentioning
confidence: 81%
See 2 more Smart Citations
“…The proposed CSA is adopted to minify the congestion cost and release the over burden of the transmission line with the introduction of the wind farm. The congestion cost achieved with the CSA is 5998.3 $/day and is minimum when compared to the other cost obtained with RED, PSO and ABC optimization methodologies referred in [15]- [17] respectively. The losses are also reduced to 58.63 MW from 59.39 MW after the application of proposed CSA for the CM approach adopted with wind farm.…”
Section: Resultsmentioning
confidence: 81%
“…The generators contributed in the rescheduling process were selected based on the Generator Sensitivity Factor (GSF) [16]. Deb and Goswami formulated CM approach with wind energy resource and Artificial Bee Colony (ABC) to optimize the congestion cost [17].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Using this concept, the value of transferring power through the transmission lines can be calculated. In traditional networks, all congested lines are considered with an equal value, ie, if 2 lines simultaneously meet congestion, there are different solutions to prioritize the lines . Therefore, their effect on stability and other parameters is used to find the higher priority, but they are not completely economical.…”
Section: Flow‐gate Marginal Pricingmentioning
confidence: 99%
“…In traditional networks, all congested lines are considered with an equal value, ie, if 2 lines simultaneously meet congestion, there are different solutions to prioritize the lines. 11 Therefore, their effect on stability and other parameters is used to find the higher priority, but they are not completely economical. In pal Verma and Sharma 12 a rescheduling-based congestion management strategy in hybrid (pool + bilateral) electricity market structure for a combination of hydro and thermal units is proposed.…”
Section: Flow-gate Marginal Pricingmentioning
confidence: 99%