1996
DOI: 10.3141/1544-08
|View full text |Cite
|
Sign up to set email alerts
|

Construction Issues in Steel Curved-Girder Bridges

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2000
2000
2011
2011

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…Grubb et al [1] stated that, in the past, the design of these bridges typically focused on the stability and strength of the completed structure during service and under ultimate load conditions, and ignored the construction. However, as curved steel bridges become shallower and longer and, consequently, less stiff, accurate prediction of movement during construction becomes even more important.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Grubb et al [1] stated that, in the past, the design of these bridges typically focused on the stability and strength of the completed structure during service and under ultimate load conditions, and ignored the construction. However, as curved steel bridges become shallower and longer and, consequently, less stiff, accurate prediction of movement during construction becomes even more important.…”
Section: Introductionmentioning
confidence: 99%
“…Since that initial project, intermittent research and discussion related to construction behavior has occurred. Grubb et al [1] outlined construction issues for steel curved I-girder bridges by describing the fabrication, erection, bracing and temporary shoring methods, and deck placement techniques. The Curved Steel Bridge Research Project (CSBRP), initiated in 1993, contained some components that addressed construction issues for curved I-girders.…”
Section: Introductionmentioning
confidence: 99%