2020
DOI: 10.1007/978-3-030-65739-0_14
|View full text |Cite
|
Sign up to set email alerts
|

Construction of a Technologically Feasible Cutting with Pierce Points Placement Constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 17 publications
0
2
0
Order By: Relevance
“…If the constructed route in the graph is an OE route and all the initial vertices of the covering chains belong to V in (G), then this route can be used as a basis for constructing a route for the cutter trajectory for laser cutting process. Let these routes be called PPOEroutes [27].…”
Section: Ppoe-routesmentioning
confidence: 99%
See 1 more Smart Citation
“…If the constructed route in the graph is an OE route and all the initial vertices of the covering chains belong to V in (G), then this route can be used as a basis for constructing a route for the cutter trajectory for laser cutting process. Let these routes be called PPOEroutes [27].…”
Section: Ppoe-routesmentioning
confidence: 99%
“…We proved the necessary and sufficient conditions of PPOE-routes existence and built the polynomial algorithm PPOE-routing constructing such routes for any plane graph. The correctness of this algorithm has been announced at the conference [27]. The purpose of this article is to present the results obtained using a single terminology.…”
Section: Introductionmentioning
confidence: 99%