2019
DOI: 10.3846/jcem.2019.7948
|View full text |Cite
|
Sign up to set email alerts
|

Construction Phase Oriented Dynamic Simulation: Taking RCC Dam Placement Process as an Example

Abstract: Construction simulation has been widely applied in schedule analysis. However, traditional simulation is based on static models built in the planning or design phase, which focuses on overall project-level schedule analysis. To provide activity-level simulation for on-site schedule management, a construction phase oriented dynamic simulation method is proposed, which takes roller compacted concrete (RCC) dam placement process as an example. Considering various innerlayer and inter-layer activities and differen… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
8
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 35 publications
0
8
0
Order By: Relevance
“…According to Chen W. C. et al’s study [ 28 ], the latest research of the Bayesian field theory approach, as a defined real scalar field variable with a constraint is firstly adopted to reparametrize and normalize each candidate of . Assume that the Bayesian prior distribution of is denoted as and can be abbreviated as .…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations
“…According to Chen W. C. et al’s study [ 28 ], the latest research of the Bayesian field theory approach, as a defined real scalar field variable with a constraint is firstly adopted to reparametrize and normalize each candidate of . Assume that the Bayesian prior distribution of is denoted as and can be abbreviated as .…”
Section: Methodsmentioning
confidence: 99%
“…In Chen W.C. et al’s study [ 28 ], the importance resampling method is utilized during the sampling process of . Based on the maximum posterior density estimation (MAP) method and Equation (9), the optimal estimate of can be obtained when the following is satisfied: …”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…Roller compacted concrete (RCC) dam has become one of the most competitive dam types due to its fast construction speed, low cost, and strong adaptability [1][2][3]. However, the current research is mostly on the RCC dam vibration compaction mechanism from a macroperspective through physical means such as rolling tests or laboratory tests, which fails to consider the mesoscopic structure of concrete fully.…”
Section: Introductionmentioning
confidence: 99%