2014
DOI: 10.1117/12.2056009
|View full text |Cite
|
Sign up to set email alerts
|

Contamination control for the space infrared observatory SPICA

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…Along with these major risks, we also carried out detailed study of contamination control, which is discussed by Isobe et al 5 As a result of the RMP activity, the "major technical risks" are significantly mitigated, and SPICA now has much higher technical feasibility than that before the start of RMP.…”
Section: Original Planmentioning
confidence: 99%
“…Along with these major risks, we also carried out detailed study of contamination control, which is discussed by Isobe et al 5 As a result of the RMP activity, the "major technical risks" are significantly mitigated, and SPICA now has much higher technical feasibility than that before the start of RMP.…”
Section: Original Planmentioning
confidence: 99%