2020
DOI: 10.1061/(asce)co.1943-7862.0001927
|View full text |Cite
|
Sign up to set email alerts
|

Contractual Perspective for BIM Utilization in US Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
13
0

Year Published

2021
2021
2025
2025

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 48 publications
(14 citation statements)
references
References 29 publications
1
13
0
Order By: Relevance
“…In the planning and design stage, a point cloud is used to reconstruct 3D models of the site and existing buildings [14,15]. In the manufacturing and construction phase, a point cloud is applied for automating construction equipment [13], digital reproduction [4,16], identification of safety hazards [17], monitoring of construction progress [18], and inspection of construction quality [17]. In the operation and maintenance phase, a point cloud is applied for reconstructing 3D architectural structures [15], building performance analyses [19], facility management for 3D model reconstruction [12], and inspection of building quality [18,19].…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…In the planning and design stage, a point cloud is used to reconstruct 3D models of the site and existing buildings [14,15]. In the manufacturing and construction phase, a point cloud is applied for automating construction equipment [13], digital reproduction [4,16], identification of safety hazards [17], monitoring of construction progress [18], and inspection of construction quality [17]. In the operation and maintenance phase, a point cloud is applied for reconstructing 3D architectural structures [15], building performance analyses [19], facility management for 3D model reconstruction [12], and inspection of building quality [18,19].…”
Section: Literature Reviewmentioning
confidence: 99%
“…As BIM models are maintained on servers or separate computers, they cannot be synchronously modified on a job-site. Thus, information transfer from the design office to the engineering office at the construction site is delayed considerably [13]. This delay can be critical in some projects, such as fast-tracked projects, where the design is developed simultaneously with the construction.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Many researchers have tried to introduce DSS for multitude of purposes within construction projects (Jelodar et al , 2014), but generally the industry is lacking integrated methodology; especially smarter tools which can automatically act on unstructured input data via available matrices to evaluate, demonstrate and visualise the outcomes in different formats and design scenarios (Kim et al , 2015). The development of DSS can create new uses for data and enhance opportunities in critical issues such as contracting and procurement (Assaad et al , 2020; Price et al , 2017). The complexity of stakeholder interactions, suppliers and different company profiles (Chen et al , 2018; Martinsuo and Ahola, 2010); reinforces the need for more structured and integrated tools.…”
Section: Background; Digital Decision Support Tools In Constructionmentioning
confidence: 99%
“…The model referred to in this study is a digital representation of the physical and functional characteristics of a facility and contains product information related to the facility. BIM centralizes project-related information in digital platforms and requires massive transmission and access to datasets during design to construction work [21]. Therefore, the data will be widely accessible to the project participants involved, and project participants can also utilize the model, including updating, inserting, extracting, or modifying information during the BIM process [18].…”
Section: Introductionmentioning
confidence: 99%