18th International Conference and Exhibition on Electricity Distribution (CIRED 2005) 2005
DOI: 10.1049/cp:20051235
|View full text |Cite
|
Sign up to set email alerts
|

Control of active networks

Abstract: High penetration of distributed generation is currently limited by passive operating methods of distribution networks. At distribution level, insufficient measurements are available to allow satisfactory control, so measurement is extended through the use of state estimation. Aspects that are described in this paper include optimal measurement location, the problems occurring with few measurements, and load models used for "pseudo-measurements". Two control philosophies are described. The first, applicable to … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2005
2005
2018
2018

Publication Types

Select...
5
3

Relationship

2
6

Authors

Journals

citations
Cited by 17 publications
(8 citation statements)
references
References 8 publications
0
8
0
Order By: Relevance
“…The latter approach should be used in more complex networks where multiple controllable components exist and determining simple control rules is difficult. [8] Even the simplest coordinated voltage control methods can improve the utilization of an existing distribution network in case of DG interconnection substantially. For instance, if the substation voltage is controlled based on network maximum and minimum voltages instead of only the local measurement, it was possible to increase the penetration of DG by a factor of 10 in one case study [1].…”
Section: B Coordinated Methodsmentioning
confidence: 99%
“…The latter approach should be used in more complex networks where multiple controllable components exist and determining simple control rules is difficult. [8] Even the simplest coordinated voltage control methods can improve the utilization of an existing distribution network in case of DG interconnection substantially. For instance, if the substation voltage is controlled based on network maximum and minimum voltages instead of only the local measurement, it was possible to increase the penetration of DG by a factor of 10 in one case study [1].…”
Section: B Coordinated Methodsmentioning
confidence: 99%
“…The disadvantage of all these methods is that they lack robustness and will not converge 28 to a unique solution in the presence of bad measurements (e.g. measurements majorly corrupted 29 by noise) [40]. …”
Section: Adapting Wls Based Tsse To Dssementioning
confidence: 99%
“…In effect this involves lowering the network voltage by as much as possible (while maintaining all parts of the network within limits) to allow maximum generation. The principles of this system have been presented previously [1][2][3] and are described briefly. The system makes a few key measurements at the generation site and the primary substation ( Figure 2) and uses state estimation to establish voltages throughout the network.…”
Section: Active Network Management Of Voltagementioning
confidence: 99%