Control of hydrogen sulfide emission from geothermal power plants. Volume III. Final report: demonstration plant equipment descriptions, test plan, and operating instructions

Abstract: Item No. Item Description C101 Scrubbing Tower. Six ft diameter by 32 ft high with skirt support. C20Cb3 construction, 150 psig design. Single segmental sieve tray with downcomers, 8 in. Teflon demister. Platform and caged ladder. V201 Pressure Leach Reactor. Eight ft diameter by 8 ft straight J sides with cooling jacket. Four leg support, 150 psig design 316 stainless steel-construction, four 8" wide adjustable baffles. To be equipped*with 15 HP turbine agitator. C102. Decanter. Ten inch diameter by 3 ft stra… Show more