tests, the power plants operated at normal capacity, and normal power flow was maintained through the second circuit of the double-circuit transmission lines. The system was effectively grounded through the neutrals of power transformers at Tanners Creek and other points. Fig. 2 shows the Dearborn 330kv transmission station.