2016
DOI: 10.1016/j.epsr.2016.07.024
|View full text |Cite
|
Sign up to set email alerts
|

Coordinated online voltage management of distributed generation using network partitioning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
29
0
1

Year Published

2017
2017
2021
2021

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 62 publications
(30 citation statements)
references
References 22 publications
0
29
0
1
Order By: Relevance
“…or lower than 0.95 p.u., the real power of ESSs or VSC2 (P ESS or P AC VSC2 ) in the same partition is used to regulate node voltages based on (17). Especially, the absolute value of Q AC VSC2 will be reduced in order to release the rating of VSC2 for real power to regulate node voltages if real power is limited by current ratings of VSC2, and the P AC VSC2 and Q AC VSC2 can be calculated through (20). The flowchart of priority-based coordination is shown in Fig.…”
Section: Priority-based Coordination Strategymentioning
confidence: 99%
See 4 more Smart Citations
“…or lower than 0.95 p.u., the real power of ESSs or VSC2 (P ESS or P AC VSC2 ) in the same partition is used to regulate node voltages based on (17). Especially, the absolute value of Q AC VSC2 will be reduced in order to release the rating of VSC2 for real power to regulate node voltages if real power is limited by current ratings of VSC2, and the P AC VSC2 and Q AC VSC2 can be calculated through (20). The flowchart of priority-based coordination is shown in Fig.…”
Section: Priority-based Coordination Strategymentioning
confidence: 99%
“…The curtailment of DG, P DG , in the same partition is considered to regulate node voltages. P DG and Q DG can be calculated through (20).…”
Section: Priority-based Coordination Strategymentioning
confidence: 99%
See 3 more Smart Citations