2017
DOI: 10.1049/iet-its.2016.0351
|View full text |Cite
|
Sign up to set email alerts
|

Coordinated optimisation problem integrating EMU circulation and timetabling for high‐speed railway

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…In a transportation network, a postdisruption response is utilized at the operational level. The typical strategies based on this method are rescheduling the rolling stock and timetable in the residual network 1113 and rerouting train or bus routes. 1416…”
Section: Introductionmentioning
confidence: 99%
“…In a transportation network, a postdisruption response is utilized at the operational level. The typical strategies based on this method are rescheduling the rolling stock and timetable in the residual network 1113 and rerouting train or bus routes. 1416…”
Section: Introductionmentioning
confidence: 99%