2020
DOI: 10.1049/iet-gtd.2020.0886
|View full text |Cite
|
Sign up to set email alerts
|

Coordination of multi‐type FACTS for available transfer capability enhancement using PI–PSO

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
8
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1
1

Relationship

1
8

Authors

Journals

citations
Cited by 22 publications
(10 citation statements)
references
References 31 publications
0
8
0
Order By: Relevance
“…Among them, usually the economic‐based objective functions such as minimisation of fuel cost and FACTS installation cost [8] and, in another perspective, social welfare maximisation [9] were considered the single economic‐based objective function in the optimization. Also, other security and technical objectives including active power loss minimisation [10], improving voltage deviation [11], power system loadability [12], available transfer capability (ATC) [13], and congestion management [14] were separately considered the main objective function. Since FACTS allocation problem basically is an investment issue, the problem should be modelled in a long‐term planning horizon.…”
Section: Introductionmentioning
confidence: 99%
“…Among them, usually the economic‐based objective functions such as minimisation of fuel cost and FACTS installation cost [8] and, in another perspective, social welfare maximisation [9] were considered the single economic‐based objective function in the optimization. Also, other security and technical objectives including active power loss minimisation [10], improving voltage deviation [11], power system loadability [12], available transfer capability (ATC) [13], and congestion management [14] were separately considered the main objective function. Since FACTS allocation problem basically is an investment issue, the problem should be modelled in a long‐term planning horizon.…”
Section: Introductionmentioning
confidence: 99%
“…To alleviate transmission congestion, some researchers studied on expansion planning methods for modern power systems. In [7]- [9], TCSC and other devices were installed to enhance the transmission capacity. In [10]- [12], probabilistic characteristics of modern power systems such as the uncertainty of wind power generation have been considered in the expansion planning process.…”
Section: Introductionmentioning
confidence: 99%
“…Among the solutions adopted to enhance the static and dynamic performance of power systems, the Flexible AC Transmission System (FACTS) devices are favourable features of the Transmission Networks (TN) [6]- [8]. Different FACTS were deployed for Available Transfer Capability [9]- [11], voltage stability [12], power losses [13], [14], dynamic stability [15], and congestion management [4], [6], [8]. A cost effective series FACTS family which modifies the effective line reactance is the Thyristor Controlled Series Compensator (TCSC) [16].…”
Section: Introductionmentioning
confidence: 99%