1992
DOI: 10.1016/0026-2714(92)90264-l
|View full text |Cite
|
Sign up to set email alerts
|

Cost analysis of a two-unit repairable system subject to on-line preventive maintenance and/or repair

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

1995
1995
2017
2017

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 1 publication
0
4
0
Order By: Relevance
“…It is therefore, essential to keep the plant in continuous operation without any trouble. Reliability models and its analysis for different types of industrial systems have been widely discussed under various assumptions and operating conditions by number of researchers [2][3][4][5][6][7][8][9]. Recently, Rizwan et al [1] extended the modeling methodology to a single unit PLC controlled system and the related reliability indices along with profit incurred to the system are obtained.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…It is therefore, essential to keep the plant in continuous operation without any trouble. Reliability models and its analysis for different types of industrial systems have been widely discussed under various assumptions and operating conditions by number of researchers [2][3][4][5][6][7][8][9]. Recently, Rizwan et al [1] extended the modeling methodology to a single unit PLC controlled system and the related reliability indices along with profit incurred to the system are obtained.…”
Section: Introductionmentioning
confidence: 99%
“…Cost per unit replacement C 8 Cost per unit reconditioning/reinstallation (All costs are in Indian Rupee)…”
Section: Introductionmentioning
confidence: 99%
“…Probabilistic analysis using modeling approach plays an important role in understanding the system behaviour in terms of reliability indices and cost benefit evaluation. Gulshan et al [1] analyzed system with perfect repair under partial failure mode and priority for repair to completely failed unit, Gopalan & Bhanu [2] considered two unit repairable system subject to online preventive maintenance and/or repair, Tuteja et al [3]- [5] worked for two units system with regular repairman who is not always available, system with perfect repair at partial failure or complete failure mode, and the profit evaluation of a two units cold standby system with tiredness and two types of repairmen. Rizwan et al [6]- [12] analyzed cold and hot standby systems with single unit and two units under different failure and repair situations where the reliability indices of interest are obtained and the cost benefit analysis of the systems are carried out.…”
Section: Introductionmentioning
confidence: 99%
“…Goel and Murari (1990) discussed two-unit cold standby redundant system subject to random checking, corrective maintenance and system replacement with repairable and non-repairable types of failure. Gopalan and Bhanu (1995) studied two unit repairable system subject to on-line preventive maintenance and/or repair. Gupta et al (1997) analysed a system having super-priority, priority and ordinary units with arbitrary distributions.…”
Section: Introductionmentioning
confidence: 99%