Cost-based dimensioning of Battery Energy Storage and energy management system for Frequency Containment Reserves provision

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 11 publications
(12 citation statements)
references
References 6 publications
0
12
0
Order By: Relevance
“…Nonetheless, the participation in primary frequency regulation also entails an important advantage -the actual activated power is on average significantly lower than the contracted capacity. Based on recent studies about FCR activation in Belgium, on average the capacity use stays below 10% of the reserved power during 90% of the time [65]. This activation factor is highly dependent on the frequency variations within the considered region, but under any circumstances below the contracted power capacity.…”
Section: Case 1 -Ftm Grid Services Use-case: Primary Reserve (Ffr/fcr) Co-optimized With Imbalance Netting Potentially Improved With Capamentioning
confidence: 99%
“…Nonetheless, the participation in primary frequency regulation also entails an important advantage -the actual activated power is on average significantly lower than the contracted capacity. Based on recent studies about FCR activation in Belgium, on average the capacity use stays below 10% of the reserved power during 90% of the time [65]. This activation factor is highly dependent on the frequency variations within the considered region, but under any circumstances below the contracted power capacity.…”
Section: Case 1 -Ftm Grid Services Use-case: Primary Reserve (Ffr/fcr) Co-optimized With Imbalance Netting Potentially Improved With Capamentioning
confidence: 99%
“…According to (15), when a customer does not have EESS, the PV output power of that customer has to be limited to the sum of the local consumption and mop P . The stored energy in EESSs can be used to increase the self-consumption, trade power in the electricity markets, charge EVs, and participate in the primary frequency control [39]- [42]. To have a more cost-efficient operation, combination of different services can be considered [43]- [45].…”
Section: Determining the Eess Set Pointsmentioning
confidence: 99%
“…This approach allows the usage of a battery storage with a smaller storage capacity without violating the requirements for FCR provision. Since the battery investment is the largest part of the investment costs [8][9][10], this combination with a PtH module can be economically beneficial [11].…”
Section: Introductionmentioning
confidence: 99%