Cost estimate guidelines for advanced nuclear power technologies

Abstract: To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 1. INTRODUCTION Several advanced power plant concepts are currently under development. These include the Modular High Temperature Oas Cooled Reactors (MHTGR), the Advanced ta Liquid Metal Reactor (ALMR) and the Ad… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
27
0

Year Published

1995
1995
2024
2024

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 34 publications
(27 citation statements)
references
References 0 publications
0
27
0
Order By: Relevance
“…Traditional costing methods [7,44] based on the Revenue Requirements Method (RRM), while suitable to the regulated regime, may prove inappropriate to the future scene. Under the traditional cost-of-service model, retail rates are set (usually by state-level public service commissions), to compensate for expenses plus an allowed rate of return applied to the rate base.…”
Section: New Assumptions and Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Traditional costing methods [7,44] based on the Revenue Requirements Method (RRM), while suitable to the regulated regime, may prove inappropriate to the future scene. Under the traditional cost-of-service model, retail rates are set (usually by state-level public service commissions), to compensate for expenses plus an allowed rate of return applied to the rate base.…”
Section: New Assumptions and Methodsmentioning
confidence: 99%
“…The annualized value of decommissioning cost, C D , is 1 mill kWh − 1 . Funds to be spent at end-of-life for decommissioning are accumulated over the first 30 years (analysis life) in an external sinking fund [7]. An explicit term for R&D cost, C R&D , could be included, as well, but assuming such costs can be effectively ammortized over a number of plants, it is dropped here, consistent with traditional practice.…”
Section: Introductionmentioning
confidence: 99%
“…Operation and maintenance (O&M) and decontamination and decommissioning (D&D) costs, along with electricity production information, yield the contributions of non-fuel costs to the overall cost of electricity. These algorithms have been derived from earlier Oak Ridge National Laboratory (ORNL) nuclear energy plant databases (NECDB) [46,47], to calculate these costs.…”
Section: Generation Iv: Economical Aspects [6]mentioning
confidence: 99%
“…Therefore, construction inputs and resource requirements for PBA were estimated by taking into account the variation in the amounts and types of chemical agent as compared with those at BGAD and PCD (PMACWA 1999b). Environmental conditions at the site were assumed to be similar to those of the Electric Power Research Institute (EPRI) Standard Hypothetical East/West Central Site, as defined in Appendix F of the DOE Cost Estimate Guidelines for Advanced Nuclear Power Technologies (Delene and Hudson 1993). (Detailed information concerning the present design of the incineration facility at PBA was not available for this analysis.…”
Section: Construction Inputs and Resource Requirementsmentioning
confidence: 99%