Cost Estimates of Near-Term Fully-Reusable Space Access Systems

Abstract: The

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2006
2006
2023
2023

Publication Types

Select...
3
3
1

Relationship

1
6

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 3 publications
(3 reference statements)
0
5
0
Order By: Relevance
“…A preliminary cost budget has been carried out by exploiting a modified version of the model developed by Koelle and implemented by Snead [26]. The model is based on a statistical correlation between the vehicle mass and its development and production costs, expressed in terms of work years and takes into account the Technologic Readiness Level (TRL) of each component.…”
Section: Discussionmentioning
confidence: 99%
“…A preliminary cost budget has been carried out by exploiting a modified version of the model developed by Koelle and implemented by Snead [26]. The model is based on a statistical correlation between the vehicle mass and its development and production costs, expressed in terms of work years and takes into account the Technologic Readiness Level (TRL) of each component.…”
Section: Discussionmentioning
confidence: 99%
“…Conceptual design studies undertaken at the Air Force Aeronautical Systems Center (Wright-Patterson Air Force Base, Ohio) have generated concepts for fullyreusable Earth-to-orbit space access systems-referred to herein as aerospaceplanes-using TRL 6-9 technologies. 1,2 Figure 2 depicts the general system configuration used in these studies. This is a two-stage, rocket-powered, vertical-takeoff, horizontal-landing system that carries cargo in an externallymounted container or passengers in an externally-carried 6-10 passenger aerospaceplane.…”
Section: Near-future Earth-to-orbit Aerospaceplanesmentioning
confidence: 99%
“…≈ 2000 ≈ 500 Table 2: Development and production costs obtained on the basis of a modified version of Koelle's model [18].…”
Section: Development Cost [M€] Production Cost [M€]mentioning
confidence: 99%
“…A preliminary cost budget has been carried out on the basis of a modified version of the model developed by Koelle and implemented by Snead [18].…”
Section: Cost Budgetmentioning
confidence: 99%
See 1 more Smart Citation