Day 3 Wed, August 04, 2021 2021
DOI: 10.2118/208226-ms
|View full text |Cite
|
Sign up to set email alerts
|

Cost Saving Through Casing Design Optimization ALA-3 as Case Study

Abstract: First E&P commenced her development drilling campaign in the ALA field with a set of four batch wells (ALA west Phase 1A). Casing design and well architecture for the four wells were determined using standard design software, as the field had significant appraisal activities. However, actual drilling of the top-hole section on the four wells were very challenging such that, only in one of the four wells was the surface casing successfully run to depth and cemented as planned. Issues encountered included bu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 3 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?