2021
DOI: 10.1007/s12665-021-09591-w
|View full text |Cite
|
Sign up to set email alerts
|

Coulomb stress analysis for several filling and operational scenarios at the Grand Ethiopian Renaissance Dam impoundment

Abstract: Increased demand for power generation coupled with changing seasonal water uncertainty has caused a worldwide increase in the construction of large hydrologic engineering structures. That said, the soon-to-be-completed Grand Ethiopian Renaissance Dam (GERD) will impound the Blue Nile River in Western Ethiopia and its reservoir will encompass ~ 1763 km2 and store ~ 67 Gt (km3) of surface water. The impoundment will undergo maximum seasonal load changes of ~ 28 to ~ 36 Gt during projected seasonal hydroelectric … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 60 publications
0
2
0
Order By: Relevance
“…A total of 112 patients with sepsis admitted to our hospital were selected. Inclusion criteria were as follows: (1) sepsis was defined according to the diagnostic criteria in the Guidelines for Emergency Treatment of Sepsis/Septic Shock in China (2018) 23 ; (2) patients aged over 18 years. Exclusion criteria were as follows: (1) ALI caused by trauma, lung surgery, drowning, and toxic gas inhalation; (2) patients were clinically confirmed with lung diseases such as lung cancer, chronic obstructive pulmonary disease, bronchial asthma, and pulmonary fibrosis; (3) patients were combined with autoimmune diseases and blood system diseases.…”
Section: Clinical Datamentioning
confidence: 99%
“…A total of 112 patients with sepsis admitted to our hospital were selected. Inclusion criteria were as follows: (1) sepsis was defined according to the diagnostic criteria in the Guidelines for Emergency Treatment of Sepsis/Septic Shock in China (2018) 23 ; (2) patients aged over 18 years. Exclusion criteria were as follows: (1) ALI caused by trauma, lung surgery, drowning, and toxic gas inhalation; (2) patients were clinically confirmed with lung diseases such as lung cancer, chronic obstructive pulmonary disease, bronchial asthma, and pulmonary fibrosis; (3) patients were combined with autoimmune diseases and blood system diseases.…”
Section: Clinical Datamentioning
confidence: 99%
“…Although, Egypt and Sudan are expected to face water scarcity challenges during the filling period (Abdeldayem et al, 2020), Ethiopia has continued their individual actions without reaching an abiding agreement with the downstream countries and filled the dam for the second year with around 2-3 BCM (Kansara et al, 2021) which empowers the downstream countries situation when Egypt jointly with Sudan took the GERD dispute file to the United Nation Security Council and shows how the situation is a matter of live for the downstream countries and how the Egypt and Sudan are concerned about such an individual action. Because decreasing the filling years means more reduction of the flow arriving to Sudan and Egypt (Abtew & Dessu, 2019;Borowski, 2020;Madson & Sheng, 2021). However, the filling period and possible political conflict is intensively dependent on climate change and the amount of the rainfall that are expected to fall during the filling period.…”
Section: Introductionmentioning
confidence: 99%