Control Systems Design
DOI: 10.1007/1-84628-215-2_13
|View full text |Cite
|
Sign up to set email alerts
|

Critical Control of Building under Seismic Disturbance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Publication Types

Select...
5
2

Relationship

4
3

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 14 publications
0
6
0
Order By: Relevance
“…was investigated in [6] (see also Chapter 2 of [14]) and was used in the controller design for buildings subject to seismic disturbances in [26]. Recently, the set P…”
Section: Criterion Of Approximation For Siso Systemsmentioning
confidence: 99%
“…was investigated in [6] (see also Chapter 2 of [14]) and was used in the controller design for buildings subject to seismic disturbances in [26]. Recently, the set P…”
Section: Criterion Of Approximation For Siso Systemsmentioning
confidence: 99%
“…In the paper, as will be seen later, a design solution of (5) (if exists) is obtained by searching in the space of design parameters. This approach has been used successfully by many researchers (e.g., Zakian and Al-Naib, 1973;Lane, 1992Lane, , 1995Whidborne and Liu, 1993;Whidborne, 2005;Arunsawatwong, 2005;Satoh, 2005). For further details, see Zakian (2005).…”
Section: Fundamental Theorymentioning
confidence: 99%
“…where β is a real number, δ denotes Dirac delta function and h1 : R → R is a bounded and piecewise continuous function for all t. It should be noted that the impulse response in (11) can be used to describe a wide class of system (4), and thus is not restricted only to rational systems. This section presents the methodology that is used in approximating the infinite-dimensional convex optimization (9) as a convex optimization problem defined in a Euclidean space, which is more easily tractable.…”
Section: Problem Formulationmentioning
confidence: 99%
“…Both P1 and P2 are useful in certain practical applications in which all the possible inputs are transient (see, for example, [7,10,11]). However, since P2 has more restrictions than P1, it can be seen that P2 contains less fictitious inputs (that is, inputs that cannot happen or are not likely to happen in practice).…”
Section: Introductionmentioning
confidence: 99%