2019
DOI: 10.1016/j.procs.2019.01.157
|View full text |Cite
|
Sign up to set email alerts
|

Critical failures of turnouts: expert approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 6 publications
0
4
0
Order By: Relevance
“…The model-based prediction of the crossing geometry deterioration is presented in [22]. An analysis of the critical failures on the railway turnouts and failure prediction using expert approach is proposed in [23]. Numerical predictions of the long-term accumulation of plastic deformation and wear are shown in [24].…”
Section: The Hht Based Features Extraction Of Crossing Degradationmentioning
confidence: 99%
“…The model-based prediction of the crossing geometry deterioration is presented in [22]. An analysis of the critical failures on the railway turnouts and failure prediction using expert approach is proposed in [23]. Numerical predictions of the long-term accumulation of plastic deformation and wear are shown in [24].…”
Section: The Hht Based Features Extraction Of Crossing Degradationmentioning
confidence: 99%
“…Melo, J.M.Cohen, and R.J. Anderson 2012) Rail accident investigation for railway safety improvement and risk management of railway infrastructure; have got a wide coverage in the research areas of railway technology. [25][26][27][28][29][30] Failure analysis models and methods have been developed chronologically. Recent publications deeply analyze the methods by gathering different failure modes and studying their effects.…”
Section: Introductionmentioning
confidence: 99%
“…Some researchers have used this Failure Mode and Effects Analysis as a means of railway risk assessment and hazard identification. [30][31][32][33] Whenever there come research results it is an intellectual attitude to investigate the reason why and how the results have been achieved.…”
Section: Introductionmentioning
confidence: 99%
“…When necessary, the point heating is switched on manually, but in this way the minimum power consumption and thus the minimum costs are not achieved. On the other hand, heating of points itself is necessary due to possibility of falling snow to turn into ice and block the point from switching [3,7]. This can lead to different situations that threaten safety on the railway [13].…”
Section: Introductionmentioning
confidence: 99%