Critical Risks Method (CRM): A New Safety Allocation Approach for a Critical Infrastructure

Abstract: In the current research, a safety allocation technique named the Critical Risks Method (CRM) has been developed. Starting from a literature review, we analyzed the shortcomings of conventional methods. The outcomes show the primary two criticalities of the most important safety allocation approaches: (1) They are developed for series configuration, but not for parallel ones; (2) they ordinarily give only qualitative outputs, but not quantitative ones. Moreover, by applying the conventional methods, an increase… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
15
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 25 publications
(15 citation statements)
references
References 20 publications
0
15
0
Order By: Relevance
“…Its key principles are the continuous assessment of newly built or pre-existent structures. This is translated into the monitoring of their serviceability health condition, risk mitigation, disaster prevention through well-organized and regularly updated maintenance [ 1 ] plans and, in the worst case scenarios, damage containment through quick emergency alarm. In order to prevent the adverse social, economic, environmental, and aesthetic impacts that may occur in case of structural and/or operational deficiency, it is important to have access to monitoring tools that encompass the features of reliability, quasi or entirely distributed measurement capacity, ease of application and cost-efficiency.…”
Section: Introductionmentioning
confidence: 99%
“…Its key principles are the continuous assessment of newly built or pre-existent structures. This is translated into the monitoring of their serviceability health condition, risk mitigation, disaster prevention through well-organized and regularly updated maintenance [ 1 ] plans and, in the worst case scenarios, damage containment through quick emergency alarm. In order to prevent the adverse social, economic, environmental, and aesthetic impacts that may occur in case of structural and/or operational deficiency, it is important to have access to monitoring tools that encompass the features of reliability, quasi or entirely distributed measurement capacity, ease of application and cost-efficiency.…”
Section: Introductionmentioning
confidence: 99%
“…Therefore the acceptability of the risks is periodically evaluated, and the costs and benefits of additional provisions. Where necessary, new works are put in place [14,[29][30][31].…”
Section: Legacy Risksmentioning
confidence: 99%
“…Imam et al [6] developed a finite element model (FEM) of a typical riveted railway bridge to analyze the effect of fatigue. Di Bona et al [7] developed the Critical Risks Method (CRM) to overcome the shortcomings of traditional techniques, which considers six factors that are able to ensure its applicability to a great variety of critical infrastructures. Obviously, for the physical models, they need accurate physical parameters to evaluate the damage, which will produce errors because the parameters are uncertain (BahooToroody et al [8]).…”
Section: Introductionmentioning
confidence: 99%