2014
DOI: 10.1016/j.artint.2013.09.006
|View full text |Cite
|
Sign up to set email alerts
|

CROSS cyclic resource-constrained scheduling solver

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 16 publications
0
2
0
Order By: Relevance
“…Constraints (17) and (18) enforce that if a product is scheduled before another product in a stage, the same schedule must be preserved in the next cycles. Similarly, makespan of a cycle is equal to the completion time of the last activity in that cycle, (19).…”
Section: Global Constraintsmentioning
confidence: 99%
See 1 more Smart Citation
“…Constraints (17) and (18) enforce that if a product is scheduled before another product in a stage, the same schedule must be preserved in the next cycles. Similarly, makespan of a cycle is equal to the completion time of the last activity in that cycle, (19).…”
Section: Global Constraintsmentioning
confidence: 99%
“…Considering the perceived gap and due to its success in representation, modeling and solving combinatorial problems in general and scheduling problems in particular [16][17][18] in this study we develop a new constraint programming model formulation for simultaneous balancing and cyclic scheduling of flexible mixed model assembly lines with parallel stations to minimize cycle time of models. This study is a continuation and extension of authors' earlier works [7] and [10].…”
Section: Introductionmentioning
confidence: 99%