Current Status of Pyroprocessing Development at KAERI

Abstract: Pyroprocessing technology has been actively developed at Korea Atomic Energy Research Institute (KAERI) to meet the necessity of addressing spent fuel management issue. This technology has advantages over aqueous process such as less proliferation risk, treatment of spent fuel with relatively high heat and radioactivity, and compact equipments. This paper describes the pyroprocessing technology development at KAERI from head-end process to waste treatment. The unit process with various scales has been tested t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
49
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
9

Relationship

2
7

Authors

Journals

citations
Cited by 107 publications
(49 citation statements)
references
References 19 publications
0
49
0
Order By: Relevance
“…Major process equipment installed in PRIDE includes an electrolytic reducer, Cathode Processor, electrowinner, and waste molten salt treatment apparatus. Remote handling tasks such as process operation and maintenance in PRIDE are performed using 17 pairs of mechanical Master-Slave Manipulator (MSM) and a Bridge-transported Dual-arm Servo-Manipulator (BDSM), and material and equipment transfer are performed using crane systems [17]. The demonstration-scale hot cell facility of this study is as a new one that is to supersede PRIDE and is capable of satisfying the increased requirements of larger scale facilities.…”
Section: Previous Design Of a Large-scale Argon Cell Facilitymentioning
confidence: 99%
“…Major process equipment installed in PRIDE includes an electrolytic reducer, Cathode Processor, electrowinner, and waste molten salt treatment apparatus. Remote handling tasks such as process operation and maintenance in PRIDE are performed using 17 pairs of mechanical Master-Slave Manipulator (MSM) and a Bridge-transported Dual-arm Servo-Manipulator (BDSM), and material and equipment transfer are performed using crane systems [17]. The demonstration-scale hot cell facility of this study is as a new one that is to supersede PRIDE and is capable of satisfying the increased requirements of larger scale facilities.…”
Section: Previous Design Of a Large-scale Argon Cell Facilitymentioning
confidence: 99%
“…The details are shown in Table 6. From Table 6, the capital unit cost using Equation (10) was estimated to be 145 US$/kgU-TRU considering interest during depreciation periods over 60 years. Tables 7 and 8 show labor costs and utility service costs, respectively: Equation (10) shows the calculation method of the capital unit cost.…”
Section: Input Datamentioning
confidence: 99%
“…Temporary storage means spent fuel pools in nuclear power plant. Accordingly, the development of pyroprocessing technology and radioactive waste disposal technology is underway for recycling spent nuclear fuel with a long-term perspective to reduce spent nuclear fuel inventory [9,10].…”
Section: Introductionmentioning
confidence: 99%
“…Then, the metallic U/TRU product is provided for the metal fuel of the sodium-cooled fast reactor. The key unit processes of pyroprocessing are the electrolytic reduction (also called oxide reduction (OR)) and the electrorefining (ER) [1][2][3][4][5][6][7][8].…”
Section: Introductionmentioning
confidence: 99%