2018 IEEE 2nd International Conference on Dielectrics (ICD) 2018
DOI: 10.1109/icd.2018.8468515
|View full text |Cite
|
Sign up to set email alerts
|

Data analysis procedure and verification for DC PD measurements in the high frequency range

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
2
1

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The measurement of the partial discharge pulses is based on the measurement circuit presented in [14,15,21,22] shown in Figure 6. This corresponds to the standard IEC 60270 partial discharge measurement circuit with decoupling impedance Z d , coupling capacitor C c , and coupling device (CD).…”
Section: Measurement Setupmentioning
confidence: 99%
“…The measurement of the partial discharge pulses is based on the measurement circuit presented in [14,15,21,22] shown in Figure 6. This corresponds to the standard IEC 60270 partial discharge measurement circuit with decoupling impedance Z d , coupling capacitor C c , and coupling device (CD).…”
Section: Measurement Setupmentioning
confidence: 99%
“…With respect to DC applications it is e.g. shown in [7] and [8], that an evaluation of acquired data of the electromagnetic spectrum of PDs in the frequency domain respectively in the time domain is suited to distinguish between different types of fault.…”
Section: Introductionmentioning
confidence: 99%