“…Multi-objective optimization not implemented 57 | 2023 | CES, EES, CAES, EHP, AC, heat pump | Operation cost, emission | Blue whale optimization algorithm | Integration of WT, PV, and MT not considered. Different charging modes of EV not analyzed |
58 | 2023 | PV, WT, battery | MG and EV cost | Enhanced variant multi-objective particle swarm optimization algorithm | Analysis of environmental pollution is ignored |
59 | 2023 | CHP, gas boiler, WT, PV, HS, BS | Operating cost of multi-microgrid, profit of the distribution company | Mixed-integer linear programming, ε-constraint approach, mixed-integer nonlinear programming | Analysis of environmental pollution is ignored |
60 | 2023 | WT, PV, battery, MT, diesel generator, FC and grid | Operation cost, emission | Improved shuffled frog leaping algorithm | Different charging modes of EV not analyzed |
61 | 2023 | thermal generators, battery and grid | operation cost, emission | efficient black widow optimization algorithm, | Integration of renewable energy sources is ignored |
62 | 2023 | PV, diesel generator, grid and battery | Energy consumption, life cycle of battery, practicality of the renewable energy usage | Extended optimal ε-variable technique | Analysis of operating cost and emission is ignored |
63 | 2024 | Battery, supercapacitor | Battery capacity loss, state of charge | NSGA-III, | Integration of renewable energy sources is ignored |
64 ... |
…”